Within ENERGOMONTAJ S.A.,
The by its 1,895 employees has a major weight, including more than 45%
of the total staff. From among the Thermo Division personnel more
than 83% are skilled workers and 16.93% technic & economic staff.
The Thermo Division structure consisting of 7 subsidiaries is so
flexible that can concentrate, a great number of personnel in a
certain area, from several thermo sites, and from hydro sites too,
when necessary.
Untill 1990 the Thermo Division installed and commissioned a capacity of 16 GW in units of different power output.
As concerns the power scope, starting with 1990 our division has
been involved in the process of rehabilitation and modernisation of
power units formerly erected, for example - by putting into operation in
2002 the unit 4 of 330 MW from TPS Turceni, totally modified and the
turbine boiler of 150 MW from Paroseni.
As the market of power erection reduced, our division turned and to other
industrial fields, using as credentials the quality and promptness of our
previous works.
The Thermo Division had already performed works related to various manufacture and erection works, and also water and natural gas supply and distribution networks, water treatment stations, district heating works or modernisation works for cement factories.
Our certified experience and capability recommend us in carrying out a wide range of works.
In order to prove yourself the above capabilities of Thermo Division, we are
waiting for you to contact us.
Iosif FALUP
Thermo Division Manager
CONTACT
Calea Dorobantilor nr. 103-105, sector 1, Bucuresti
cod postal 010561
Tel.: +4021 318 93 03; +4021 318 93 28; +4021 318 93 08;
Fax: +4021 318 93 27
E-mail: termo@saem.ro
PRODUCTION CAPACITIES
1. Erection and repair works
55,000 t/ year
2. Special corrosion protection works
72,000 sqm/ year
3. Still structures manufacture works and
other products ( made in the Timisoara
Dr. Tr. Severin and Isalnita workshops,
as well as in other manufacturing areas
from the sites )
3,960 t/ year
4. Total staff
1,895 persons
> workers
1,574 persons
> engineers and technical & economic staff
321 persons
MAJOR WORKS DEVELOPED:
Thus, we can synthesize our erection and commissioning activity:
| > steam boilers with capacities > steam boilers with capacities > steam boilers with capacities > hot water boilers with capacities > hot water boilers with capacities > steam turbines > steam turbines > steam turbines > steam turbines > steam turbines > independent Diesel groups > electrostatic dedusting installations |
under 400 t/h between 400 and 1,000 t/h of 1,035 t/h up to 100 Gcal/h of 100 Gcal/h under 50 MW of 50 MW of 100 MW and 150 MW of 200 MW of 315 MW and 330 MW up to 7,000 HP up to 700,000 cm/h |
276 units 132 units 10 units 38 units 82 units 128 units 60 units 24 units 20 units 15 units 169 units 84 units |
AMONG OUR MAJOR ACHIEVEMENTS WE CAN ENUMERATE:
| - TPS Turceni - TPS Rovinari - TPS Brăila - TPS Mintia - TPS Iernut - TPS Işalniţa - Petrobrazi |
(7 x 330 MW); (2 x 200 MW + 4 x 330 MW); (3 x 200 MW + 1 x 330 MW); (6 x 210 MW); (4 x 100 MW + 2 x 200 MW); (2 x 100 MW + 3 x 50 MW + 1 x 55 MW + 2 x 315 MW); ( 2 x 25 MW + 2 x135 steam to/h cogeneration + 2 x 50 steam to/h ). |
THERMO DIVISION Calea Dorobantilor nr. 103-105, sector 1, Bucuresti, cod postal 010561 |
|
BUCUREŞTI BRANCH |
|
MOLDOVA SITE |
|
ROVINARI SITE |
|
MUNTENIA SITE Lot FIENI MECANIC
|
|
PROGRESU SITE Lot I TELEAJEN |
|
ROVINARI BRANCH |
|
TURCENI BRANCH |
|
TURCENI SITE |
|
CRAIOVA SITE |
|
ROVINARI SITE |
|
ORADEA BRANCH |
|
DEVA BRANCH |
|
DR. TURNU SEVERIN BRANCH |
|
TIMIŞOARA BRANCH |
|
ARAD SITE |