WORKS - THERMO

WORKS IN PROGRESS

- 2010 -


Beneficiary

Country

Denomination and scope of work

Starting date

Completion date

- THERMO -

A. Works in progress

CET GOVORA

România

  • Replacement of live steam pipes unit 5-TPP Govora

20.06.2007

31.12.2010

CET GOVORA

România

  • Repair of 16 beater mills + 4 reddler belts

01.04.2010

30.11.2011

RAAN Sucursala ROMAG TERMO

România

  • 420t/h boilers ESP installation for the limitation of dust emissions from boiler no. 6 stackl – TPP Drobeta Tr. Severin

10.12.2008

31.12.2011

S.C. CE ROVINARI

România

  • Auxiliary installation unit 6 mashine room - TPP Rovinari

19.02.2008

31.12.2010

S.C. CE ROVINARI

România

  • Overhaul of block 6 pressure system - TPP Rovinari

18.10.2007

15.04.2011

S.C. CE ROVINARI

România

  • Wet flue gas desulphuration installation - TPP Rovinari

01.01.2008

31.12.2012

S.C. CE ROVINARI

România

  • Overhaul, rehabilitation and modernization of unit 6 electrical and automation installation - TPP Rovinari

27.07.2008

28.09.2010

S.C. LUKOIL ENERGY

România

  • Erection of boiler 4 equipment (pipes, exhausters, air and gas flues, etc.)

11.12.2009

12.04.2010

S.C. LUKOIL ENERGY

România

  • Erection of boiler 4 bag filter

11.12.2009

15.04.2010

S.C. LUKOIL ENERGY

România

  • Erection of boiler 4 gas line.

11.12.2009

15.04.2010

S.C. LUKOIL ENERGY

România

  • Erection of live steam and feed water circuit

11.12.2009

24.03.2010

S.C. LUKOIL ENERGY

România

  • Erection of cooling water circuit

11.12.2009

21.05.2010

S.C. LUKOIL ENERGY

România

  • Thermal insulation of boiler 4 pipes and equipment

11.12.2009

28.05.2010

S.C.LUKOIL ENERGY

România

  • Architectural works at boiler 4 and bag filter building.

15.03.2010

01.05.2010

S.C. LUKOIL ENERGY

România

  • Refractory walling works at boiler 4.

27.01.2010

28.05.2010

S.C. LUKOIL ENERGY

România

  • Erection of fuel supply and bottom ash removal installation at boiler 4

22.02.2010

28.05.2010

S.C. LUKOIL ENERGY

România

  • Manufacturing of 3 bunkers

22.02.2010

22.04.2010

S.C. METKA SRL

România

  • 867 MW power station combined circuit - Brazi

04.12.2009

30.09.2010

SIEMENS - Viena

România

  • Desulphuration - TPP Turceni

25.01.2010

31.11.2011

S.C. CE TURCENI

România

  • Modernization of boiler 4 ESP in order to reduce the stack dust emissions

21.01.2010

30.11.2010

S.C. ROMELECTRO S.A.

România

  • Solutions for the removal, transportation and storage of waste resulted from the process of coal burning in boilers - TPP Turceni

09.10.2009

30.09.2012

S.C. ROMELECTRO S.A.

România

  • Increase the steadiness of slag and ash storage on the left and right side of Jiu River – Isalnita Electric Station using the dense phase technology

24.09.2008

30.04.2010

S.C. ROMELECTRO S.A.

România

  • New slag and ash storage at Garla performed based on dense slurry method; collecting, preparing and disposal works of dense slurry in compartment 1, including transport pipes - TPP Rovinari

22.04.2008

31.03.2010

S.C. TERMOSERV Rovinari

România

  • Repairs of boiler 6 air and gas pipes – TPP Rovinari

14.11.2007

14.11.2010


B. Works to be contracted


România

  • Desulphuration of unit 4 – TPP Rovinari


România

  • Desulphuration of unit 5 – TPP Rovinari


România

  • Unit 1 ESP rehabilitation - TPP Arad


România

  • Overhaul of boiler 4 - TPP Drobeta Tr. Severin


România

  • Unit 7 ESP rehabilitation – TPP Govora